Catchup
I won a free copy of Windows 7 Ultimate for having a Windows 7 Launch Party at guess where….my house!! It is a strange way Microsoft is introducing the new operating system. So next week on the Oct 23, I have invited a bunch of friendsover to see the new operating system and have some burgers and beer. Should be fun! I have already received my party package complete with streamers, napkins, cards, and a bunch of other shit and my free software. Actually, I am so enthusiastic with the software, it wouldn’t have taken much for me to have a party to show off the features anyway.
Because of the party, I decided my computer desk need to be refinished. I was a bit embarrassed with my grungy desk and it needed a new look if I was going to have guests over checking out the new software. The refinishing came out great, but my computer was disassemble and posting wasn’t possible. This will be a quick catch up on this week’s activities.
The instrument panel is now cut out. I hope to start cutting instrument openings next week.
The submerged NACA scoop came out really nice. All work was done from the inside of the plane so no repainting was necessary .
The inside part of the NACA.
I made a duct from the NACA to the eyeball vent which will be installed on the the arm rest cover. It has a little bit of a weird shape to clear the aileron torque tube. I also will install a pilot controlled door in the the vent duct to allow for pressurization of the cabin when flying in rain or when extra ventilation is needed.
This is how the vent will look in the back seat.
I was going to use a piece of Alum to make a control handle for the overboard oil heat door, but after I made it I found it weighted in at 15 grams.
I then remembered I am using the same style knobs for all interior electrics controls and can also use it for the heat door. The knob only weight 8 gms for a savings of 7 gms over the Alum part and it works just as well. It will give me a more consistent look for the interior. I will recycle the alum part for an exterior canopy latch.
The purge valve dump push/pull system is completed. I have started checking out options for the wiring install.