Apr 07 2010

Cylinders Work

Cylinders #1 and #3 were installed today.  Had a bit of trouble with the push rods (there is a specific procedure to measuring and testing them)but in the end everything went together fine and all measurements are within specification.

Pat had the high compression pistons coated with a solid lubricant (they look black)  and the crown of the pistion ceramic coated.  It will give the engine a little more power.  He also had the new cylinder flow ported.  I checked them out and it looks nicely done.

The push rods were painted crackle black which makes them stand out a bit.  Once the baffles are installed, most of the push rod tubes will not be visible.

The inlet ducts were also painted crackle black.  I wanted them to stand out and not look like regular glass.  Yesterday, when I microed fuel probe area, I also filled the inlet ducts to smooth them out a little prior to painting.

The Stbd duct.  I like how the gold rivets stand out on the black… 

I am not going to install #2 and #4 cylinders until next Monday.  My buddy Tony wants to learn how to replace a cylinder, so we will do it together in a week or so.    It will cost him lunch at Aunt Bee’s.

The fuel probe installation has been microed and sanded.  A little paint and you’ll never know they are there.