Digging footers
Todays job was to dig footers for the brick columns and pour concrete in them.
the trailer is ready to go with about 1/2 cube (220 ea) of bricks.
I had to cut a LOT of bricks to go around the slab so it would look like the slab was poured AFTER the columns were set in place. A diamond blade from $30 Harbor Freight cut them as easily as a piece of wood.