Mar 08 2012

Digging footers

Todays job was to dig footers for the brick columns and pour concrete in them.CIMG0586

the trailer is ready to go with about 1/2 cube (220 ea) of bricks.

CIMG0591

I had to cut a LOT of bricks to go around the slab so it would look like the slab was poured AFTER the columns were set in place.  A diamond blade from $30 Harbor Freight cut them as easily as a piece of wood.

CIMG0595