Porch work Continues
Work was started on the 1/2 wall after the column, bases were brought up to the slab level.
The half wall was started
Finally the column were brought up slightly above the wall. Next I need to bring up the two 3/4 column on each corner of the slab. test
Finishing off the side columns.
Finally, DONE… next it will be time to start pouring concrete caps and steps.