Mar 12 2013

Pool: Getting ready for first pour

Today was preparing for the bottom concrete pour. I placed steel rebar around the perimeter and a 3” dam around the interior of the pool.

wpid-CIMG2167-2013-03-12-21-06.jpg

This pour will keep keep the water pressure on the bottom of the pool from pushing the bottom out. The inside lip will keep the bottom steel nicely in place.

No Comments

No comments yet.

RSS feed for comments on this post.

Leave a comment