The roof work has begun
This week is absolutely crazy busy for me.. A hell of a lot of stuff is going on here and I am not great at multitasking. I like to work on on one project at a time until completion….
The construction bin was dropped off. I didnt want to have to go to the dump with all the shingles and wood scraps and the bin is just wonderful!
A couple of more truck loads of dirt were dropped off. Man, I am having a great time with the dozer!
Every guy needs a dozer in the back yard to play with!
The lights in the kitchen were removed to install light tubes (like sky lights). What a mess in attic to install as there was a lot of interference stuff up there. The installation is now prep’d and ready for me to cut a hole in the roof.
The truck load of wood has been dropped off to rebuild my roof for a new look.
Today the back sheds were stripped and prep’d for shingles.
Before
After (getting a bit dark)
Tony and I also built the scaffolding to build the soffits and a ramp to direct the shingles into the bin
It is crazy that for the whole month of November, we had almost no rain, and extremely pleasant temps (65-75f). After I decided to this is the time to reshingle the roof, Tuesday we had a good soaking rain, and tonight the first freeze of the year with a high in the 50’s this week. My timing is about as good as how I anticipate the stock market….. it sucks.