Mar 13 2012

Porch work Continues

Work was started on the 1/2 wall after the column, bases were brought up to the slab level.

wpid-IMG_0712-2012-03-13-17-01.jpg

The half wall was started

wpid-IMG_0737-2012-03-13-17-01.jpg

Finally the column were brought up slightly above the wall. Next I need to bring up the two 3/4 column on each corner of the slab. test

wpid-IMG_0773-2012-03-13-17-01.jpg

Finishing off the side columns.
wpid-IMG_0792-2012-03-13-17-01.jpg

Finally, DONE… next it will be time to start pouring concrete caps and steps.

wpid-IMG_0811-2012-03-13-17-01.jpg