Jul 02 2012

The walls are going up!

I decided to direct all my time to getting a roof over the work area for a couple of reasons. One is for shade, but the most important reason is to protect the job site from rain. I am worried if we have a significant rain, the water from the roof will cave in the side of the pool since the pool is drained. Once the worksite is covered, then I’ll concentrate on the pool area and decking.

Over the weekend I painted all the roof rafters and left areas so the perlings could be glued/screwed in place

wpid-CIMG1324-2012-07-2-20-21.jpg

This is the header beam for the roof
wpid-CIMG1325-2012-07-2-20-21.jpg

It is starting to look like a structure now.

wpid-CIMG1329-2012-07-2-20-21.jpg