Apr
19
2014
Block retaining wall continued
The wall is taking shape nicely, but I am still not sure how I am going to finalize the end. I guess I’ll work that out when I get there..
Foundation is started. A gravel drain on the backside was installed on the back side to to prevent excess water pressure from casing wall collapse.
.
I custom cut the top and glued the cap pieces around the curve and decided to put an loop at the end for flowers.
Back fill the low area with top soil and plant some grass.
The final result. I like it….