Sep 28 2009

Prototype Oil sump….done

The sump is done!  At least the prototype is.  It has been sent off to Calif to the fabricator.  I cant wait to see the production model! 

This weekend was a little of a setback.  When started putting the parts in Acad and modeling the sump for the fabricator, I found out it would have been very hard to build.  Oops!  Back to tweeking the angles, distances, positions until I had a fuller understanding of what was need modeled.  After remodeling it again in Acad and all was good. 

IMG_3528

I tried bending mock up tubing to be sure I COULD bend it and adjust for slight differences in tube lengths which is a problem when you are making very short straight runs.  I now have to send the fuel servo back to Airflow Performace for a second time to have them reposition the fuel outlet and reverse the mixture valve all of which was done for for  first prototype.

IMG_3524

When you look at the first sump, this one is certainly much simpler, easier to build and yes,  ..elegant… but lacks the coolness factor of the first one.

IMG_2944

7.3 hrs worked