Pool: Second pour

I have completed the second concrete pour. This was a tough one. It took about 5 hours to complete. I used 30 bags of concrete which I estimate equals 1 ton of mixed concrete. Since the bags were also handled it means I lifted 4200 lbs today. The crazy thing is I still walked my route, washed the car and did some laundry. Amazing.