Mar 18 2013

Pool: Final Insulation Install

Here you can see how the concrete was placed at half way up the side walls for the hoop stresses.

wpid-CIMG2239-2013-03-18-21-42.jpg

The final install of insulation was completed.

wpid-CIMG2241-2013-03-18-21-42.jpg

Now I have R-15 insulation above ground and R-20 below ground and R-10 on the bottom of the pool. This is much better than the R-5 which I had originally installed.

wpid-CIMG2245-2013-03-18-21-42.jpg